Bu sayfa şimdilik İngilizce. Türkçesi hazırlanıyor.

Profesyoneller

Profesyonellerle çalışmak.

Mimarlar, geliştiriciler, otelciler ve yüklenicilerle birlikte tasarlar ve üretiriz. Tek ekip, tek standart, tek muhatap.

Tek sıra doğramaya kurulmuş kompakt ofis mutfağı; eviye, ocak ve boy dolaplar eş kapakların ardında

Kimlerle çalışıyoruz

Projeniz için kurulmuş.

Architects and interior designers

Detailed drawings, material samples and a single point of contact from concept to handover.

Developers and hoteliers

Repeatable units, prototype sign-off and batch production with consistent quality across every room.

Contractors

Clear installation drawings, service-point schedules and on-site support from our fitters.

Ne sunuyoruz

Güvenle şartname yazmanız için gereken her şey.

Drawings on request

Plans, elevations and detail sections prepared for your project.

Material samples

Quartz, porcelain, timber, metal and glass sent or brought to your studio.

Technical support

A named contact for questions about loads, services and tolerances.

Project partnership

Early involvement in the design so storage and services are planned together.

Bir profesyonel proje nasıl yürür

Beş adım, tek muhatap.

Adımlar tek bir daire için de bir otel katı için de aynıdır. Süre kapsama bağlıdır; çizimler onaylandığında bir programı teyit ederiz.

  1. 01

    Introduction

    Tell us the stage of the project, the drawings you have and the programme dates that matter. A short call is usually enough.

  2. 02

    Technical review

    We review the drawings for services, dimensions and buildability, and list questions and suggestions before anything is priced.

  3. 03

    Proposal and samples

    A written proposal with scope and schedule, and physical samples of quartz, porcelain, timber, metal and glass for you and your client.

  4. 04

    Detailed design and sign-off

    Joinery drawings, schedules of finishes and service points, issued for your approval. Production starts only after sign-off.

  5. 05

    Production and installation

    Made to order, checked, delivered and installed by our own team, with a named contact throughout.

Sizden neye ihtiyacımız var

Erken ne kadar çok bilirsek, sonra o kadar az değişiklik olur.

Mimarların ve tasarımcıların bitmiş bir set göndermesi gerekmez. Erken bir çizim ve kısa bir sohbet başlamak için yeterlidir.

Current drawings

Plans, sections and elevations, at whatever stage they are. We would rather see an early set than wait for a perfect one.

Service positions

Where water, drainage, power and extraction arrive, and what can still move.

Finishes already specified

Any schedule of materials, colours and appliances that the design already relies on.

Programme dates

Design freeze, site access and handover, so we can plan the long items first.

Decision-makers

Who approves drawings, samples and changes on the client side and on the contractor side.

Site conditions

Access, lifts and stairs, floor protection and building rules that affect delivery and installation.

Sağladığımız çizimler

Şantiye ekibinizin uygulayabileceği bir set.

Layout plans and elevations

Every unit, drawer, door and appliance placed at full detail.

Joinery detail sections

Construction of edges, junctions, shadow gaps and fixings.

Schedules of services

Positions of water, drainage, power and extraction, for the building trades.

Schedules of finishes

Every material, colour and fitting listed against the drawings.

Installation drawings

A clear set for fitters and the contractor, with the sequence of work.

Set, projenin kapsamına bağlıdır. Neyin gerektiğini teklif aşamasında kararlaştırırız.

Termin süreleri

Açıkça yönetilir, saklanmaz.

Lead times depend on scope and on what is specified, so we do not quote a standard figure. What we do is manage them openly.

  1. 01

    We name the long items early

    Worktop surfaces, appliances and special finishes are usually the items that set the programme. We list them in the proposal.

  2. 02

    We ask for dates in writing

    Order deadlines are confirmed in writing against your programme, so nothing waits on an unanswered question.

  3. 03

    We order the long items first

    Cabinetry can be made while worktops and appliances are on their way, and the sequence is planned so that each trade arrives when it is needed.

  4. 04

    We tell you early if something moves

    If a date is at risk, you hear about it when we know, with the options and their effect on the programme.

Sorular

Bilmekte fayda var.

Bir cevap kapsama bağlıysa bunu açıkça söyleriz. Buradaki hiçbir şey teklif değildir.

Mimarımızın çizimleriyle çalışabilir misiniz?

Evet. Elinizdeki çizimleri hangi aşamada olurlarsa olsunlar gönderin. Onları tesisat, ölçüler ve uygulanabilirlik açısından inceler, neyi neden değiştireceğimizi söyler ve ardından onayınız için ayrıntılı doğrama çizimleri hazırlarız.

Hangi çizimleri sağlıyorsunuz?

Yerleşim planları ve görünüşler, doğramanın detay kesitleri, tesisat noktaları listesi, yüzey listesi ve montajcılar için montaj çizimleri. Set, projenin kapsamına bağlıdır.

Termin sürelerini nasıl yönetiyorsunuz?

Uzun terminli kalemleri teklif aşamasında belirleriz. Tezgâh yüzeyleri, cihazlar ve özel yüzeyler genellikle bunlardır. Program tarihlerinizi erken ister, sipariş son tarihlerini yazılı olarak teyit eder ve önce uzun kalemleri takip ederiz. Gerçek termin süreleri kapsama ve şartnameye bağlıdır.

Onaydan sonra tasarım değişirse ne olur?

Değişiklikler üretim başlamadan önce kolay, sonra zordur. Her değişikliği programa ve maliyete etkisiyle birlikte yazılı olarak kaydeder, uygulamadan önce onay isteriz.

Aynı üniteyi birçok odada tekrarlayabilir misiniz?

Evet. Oteller, servisli daireler ve geliştirme projeleri için onay amacıyla gerçek ölçekte tek bir prototip üretir, ardından partiyi ona göre üretiriz; böylece her oda aynı olur.

Şantiyede yüklenicimizle nasıl çalışıyorsunuz?

Montaj başlamadan önce yüklenicinizle erişimi, sırayı ve sorumlulukları kararlaştırırız. Montajcılarımız dolapları, tezgâhları ve donanımı kurar; bina tesisatına bağlantılar yerel kuralların gerektirdiği yetkili ustalar tarafından yapılır.

Profesyonel projelerde ödemeler nasıl işler?

Koşullar iş başlamadan önce yazılı olarak kararlaştırılır. Büyük projelerde genellikle tasarım onayı, üretim ve montaj gibi aşamalara bağlanır. Takvim kapsama bağlıdır ve teklifte açıkça belirtiriz.

Profesyonel erişim isteyin

Projeyi anlatın.

Kimsiniz?

İki iş günü içinde cevap veririz. Bilgilerinizi yalnızca size cevap vermek için kullanırız.